Thursday, 8 December 2016

Oracle BOM - Basic Definitions

Billing Loop

Bill loops occur when a bill is assigned as a component to itself somewhere in the multilevel structure of the bill. The loop check program searches for such loops.

Charge type in a Resource definition

Charge type determines how each resource is charged in Work in Process. When an operation completes, Work in Process records the units applied to the job or repetitive schedule in the resource unit of measure. You can charge resources manually or automatically.

• Manual: Work in Process does not automatically charge this type of resource to a job or repetitive schedule. You must manually charge it to a job or repetitive schedule using Work in Process.

• PO Receipt: Automatically charge this resource upon receipt of a purchase order in Oracle Purchasing. The assemblies are not automatically moved to the next operation upon receipt, so you must manually move them using Work in Process.

• PO Move: Automatically charge this resource upon receipt of a purchase order in Oracle Purchasing and move the assemblies to the Queue intraoperation step of the next operation, or to the To move intraoperation step if this is the last operation.

• WIP Move: Work in Process automatically charges this type of resource to a job or repetitive schedule when you complete an operation.
 

Supply types for BOM in EBS

A bill of material component field, that controls issue transactions from inventory to work in process. 

Supply types supported by Work in Process include: Push, Assembly pull, Operation pull, Bulk, Supplier, Phantom, and Based on bill.  

By-products in BOM  

Material produced as a residual of a production process. By-product components are represented by negative usage in the bill of material for an assembly.

No comments:

Post a Comment